Article 1: Definitions
For the purposes of these delivery conditions:
a. Client: the natural or legal person who has ordered the contractor to manufacture goods and/or carry out activities and or provide services; Contractor: TAH-DAH which has accepted the contract referred to in point (a) or has submitted a tender or offer prior to a possible contract;
c. Information carriers: Magnetic tapes and discs, optical discs and all other devices designed to record, process, transmit or reproduce texts, images or other data by means of equipment, in the broadest sense of the word;
d. Activities: all that the contractor makes and/or does, or does, for the benefit of the client, within the framework of the assignments which he makes and/or undertakes for the purpose of the communication service.
e. Offer: the specification of the work to be done.
f. Budget: the costs associated with the work set out in the tender;
g. Written: Where these general terms and conditions refer to in writing, a message by e-mail is equivalent to this.
Article 2: Applicability and general provisions
1. These delivery conditions apply to the establishment, content and performance of all contracts concluded between the client and the contractor for the provision of services or performance of work
2. General (buy-in) terms and conditions of the client apply only if it has been expressly and in writing agreed that they will apply to the contract between the parties to the exclusion of these delivery terms.
3. If derogations have been agreed on certain matters governed by these general terms and conditions, these general conditions shall continue to apply to the rest of that Agreement. The derogations agreed never apply to more than one order, unless confirmed in writing again.
Article 3: Non-solicitation clause
Client is not permitted to enter into any contract of employment with staff employed by or on behalf of the Client's Office during a period of 6 (six) months after the end of the contract, on penalty of a penalty of €2,000,- for any infringement per week that continues the infringement.
Article 4: Quotations and offers
1. The mere issue of a quotation, budget, precalculation or similar notice, whether or not indicated with a quotation, does not oblige the contractor to conclude an agreement with the client.
2. Offers from the contractor are always free of obligation and can only be accepted without any derogations. An offer shall in any event be deemed rejected if it is not accepted within one month. An offer shall mean a proposal made to the contractor for the conclusion of an agreement, which has been determined in such a way that an agreement arises immediately as a result of its acceptance.
3. All offers are without obligation unless the tender expressly states that they are an irrevocable offer.
4. The prices mentioned are exclusive of VAT, travel and other expenses and costs of third parties unless otherwise indicated.
Article 5: Assignment and amendments
1. A contract shall be accepted by the contractor by either confirming the acceptance in writing to the client or by the actual performance of the work, upon receipt of a tender signed by the client for agreement.
2. Requests for modifications to the contract after acceptance shall be submitted by the client to the contractor for assessment. Amendments may be requested only in writing.
3. Any additional costs arising from changes in the contract shall be borne by the client. The contractor will submit these additional costs in writing and specified to the client. The amendments shall take effect only after the client has agreed in writing to the additional costs.
4. In the event of changes in the contract award or in the event that the purpose of the contract cannot continue because of force majeure on the part of the client, the contractor will have to pay compensation of the total design fee and the costs incurred up to then.
5. If changes in the order result in the agreed delivery time being exceeded by the contractor, this is for the account and risk of the client.
Article 6: Cancellation
1. The client is entitled to cancel an agreement before the contractor has started the execution of the agreement, provided he compensates for the damage caused to the contractor. Such damage shall include losses and losses incurred by the contractor and in any event the costs already incurred by the contractor in preparation, including those of reserved production capacity, purchased materials, services claimed and storage and reasonably incurred costs (costs of design, drawing, calculation, preparation, storage, commission etc.).
Article 7: Engagement of third parties for execution work
1. If, in the sole opinion of the contractor, this is reasonably necessary for the proper performance of the contract, or results from the nature of the contract, it is entitled to order the supply of goods and/or services on behalf of and on behalf of the client.
2. If the client himself takes care of execution (further execution of the assignment) (production, lithography and all other external matters), the contractor is not responsible and liable for the final result. The contract and liability of the contractor ends at the time of transfer of the basic or reproductive materials.
3. If third parties need to be involved in the work entrusted to the contractor, the contractor shall, if and as far as possible, consult with the client and the contractor in advance, taking due care when selecting these third party contractors. The Supplier shall not be liable for any errors and/or shortcomings of such third party in the performance of its services. Contractor has the right to accept, on behalf of the client, a limitation of liability that such party would have stipulated.
Article 8: Termination of the agreement
1. Contractor has the right to terminate the agreement in the interim if: - Apart from the design, final design, work drawings or any other production is not or is not made by the contractor; - The contractor is not allowed to employ the external expert or specialist it considers necessary, the costs of which will have to be borne by the client; - The contraaing authority is in default and defaults with the fulfilment of its obligations arising from this or other agreements with the contractor. - In those cases, the contractor is entitled to reimbursement of the hours worked and the costs incurred, without prejudice to the right to further compensation.
Article 9: Price
1. All prices quoted are exclusive of sales tax (BTW) and other taxes imposed by the government and any shipping and port charges, unless expressly agreed otherwise.
2. The price indicated by the contractor for the performance to be performed shall apply only to the performance in accordance with the agreed specifications.
3. In the case of compound offers, there shall be no obligation to provide part of the total service at the amount specified in the offer for this part or at a proportional part of the price declared for the whole.
4. If no price has been agreed between the parties, but the parties have concluded one or more contracts of equal or almost equal content in a year preceding the contract, the price will be calculated on the basis of the production methods used and calculation rates used.
5. If, in accordance with the provisions of the previous paragraph of this Article, no price has been agreed between the parties if only an estimated price has been issued or the agreed price may be modified under these general terms and conditions, the price or modification shall be determined at an amount considered reasonable in the printing industry.
6. If no fixed price has been agreed, the price for the services provided by the contractor shall be determined on the basis of these hourly rates for similar contracts, hours worked on the contract and costs incurred for the performance of the contract.
7. If no fixed price has been agreed and/or no delivery date has been set and is required by the client for overtime, night or weekend work, the hourly rate is increased by 50 percent.
Article 10: Price changes
Contractor is entitled to increase the agreed price when one or more of the following circumstances arise after the conclusion of the contract:
1. Increase in the cost of materials, semi-finished products or services required for the implementation of the agreement, increase in shipping costs, increase in wages, employers' social security costs, increase in the costs of other working conditions, introduce new and increase in existing government levies on raw materials, energy or residuals, a significant change in currency ratios or, in general, conditions comparable to that.
2. Extra effective text, unclear copy, unclear sketches, drawings or models, defective information carriers, faulty computer software or data files, improper way of supplying the materials or products to be supplied by the client and all similar supplies by the client who required the contractor to do more work or cost than he could reasonably expect when entering into the agreement, are grounds for increasing the agreed price. Also exceptional or reasonably unforeseeable processing difficulties arising from the nature of the materials and products to be processed are grounds for increasing the agreed price.
3. The contractor shall be entitled to increase the agreed price or to reduce the price if the client makes changes to the specifications originally agreed, including author corrections or modified instructions after receipt of working drawings, models and sets, printing and other tests. The contractor shall cooperate within the reasonable limits of such changes if the content of the performance to be performed by him does not differ substantially from the performance originally agreed.
Article 11: Payment term and security
1. Unless otherwise agreed, the client must pay the price and the other amounts due under the agreement within 14 days of the invoice date, without having recourse to any discount, netting or suspension. However, payment must be made in cash upon delivery if the client is a natural person who does not act in the exercise of a profession or business. In case of non-time payment as intended, the client is in default without the contractor's notice of default being required.
2. The contractor shall be entitled, in the event of an agreed delivery in instalments after delivery of the first part, to ask for payment of the costs incurred for the whole delivery, such as the cost of the work, the cost of the test.
3. The Client shall at any time and regardless of the agreed payment conditions, at the first request of the Contractor provide security for the payment of the amounts payable to the Contractor under the Agreement. The security offered must be such that the claim is adequately covered with any subsequent interest and costs and that the contractor will be able to settle it without difficulty. A security which may subsequently become insufficient will have to be supplemented to sufficient security at the contractor's first request.
4. If the principal does not pay in good time as referred to in paragraph 1 of this Article, the legal commercial interest, or if applicable, the statutory interest, shall be due on account of the delay in payment of the amount due by him from the invoice date on this amount. The contractor shall be authorized to charge a twelfth of this interest for each month or part of a month in which the client has not fully fulfilled his obligation to pay.
5. In the case of non-time payment as referred to in paragraph 1 of this Article, the principal shall be required, in addition to the amount due and the interest generated thereon, to pay in full both out-of-court and judicial collection costs, including the costs for lawyers, bailiffs and collection agencies. Extrajudicial costs are set at at least 15% of the principal amount with interest at a minimum of €100.00.
6. All payments must be made by cashier, post office or bank account contractor, or another account to be designated by him.
7. Each payment will first be deducted from the outstanding interest and costs of this client and then deducted from the oldest invoice, regardless of any invoice numbers or invoice descriptions mentioned by the client.
Article 12: Liability
1. The liability of the contractor under the agreement with the client is limited to such an amount as is proportionate to the agreed price according to reasonableness and fairness.
2. The contractor shall not be liable for any damage of any kind resulting from or after the client has put the manufactured goods into service, processed or processed after delivery, delivered them to third parties, or put them into service, or had them processed or processed or supplied to third parties.
3. The contractor is also not liable for damage in the form of loss of turnover or reduced goodwill in the company or profession of the client.
4. The contractor is also not liable for damage to material or products received by him from the client and by printing, editing or processing the contractor if the contractor has not provided the contractor with an indication of the properties and nature of these materials or products at the latest when entering into the contract and has provided proper information on the pre-processing operations and surface operations applied.
5. If the contractor is held liable by a third party in respect of any damage for which he is not liable under the contract with the client or these terms of delivery, the client will fully indemnify him in this respect and the contractor will reimburse him for everything he has to comply with this third party.
6. In all cases, the liability of the contractor on account of a fault in the performance of an agreement arises only if the contractor fails promptly and properly in writing, setting a reasonable time limit for resolving the deficiency, and the contractor continues to fail to fulfil his obligations even after that period. The notice of default should contain a description of the deficiency as complete and detailed as possible, so that the contractor is able to respond adequately.
7. The condition for the creation of any right to compensation is always that the client reports the damage in writing to the contractor as soon as possible after the occurrence of the damage. Any claim for damages against the contractor shall lapse as a result of the single course of 12 months after the commencement of the action.
8. The Client shall indemnify the contractor against all claims made by third parties concerning the accuracy of the actual content of communications and other materials produced on behalf of the Client, which have been submitted to him.
Article 13: Exclusion of liability
1. Claim rights and other powers of the client or a third party to the contractor in connection with an agreement shall expire within one year of being reasonably known to the client or the third party with these rights or powers.
2. Any liability of the contractor for any work performed or performed by, or on behalf of, the contractor or otherwise related to a contract awarded to the contractor shall be limited to the amount to which, in the case in question, is entitled under the liability insurance of the contractor, plus the amount of the own risk incurred by the contractor on the basis of the terms and conditions of such insurance.
3. If, for any reason, the applicable liability insurance of the contractor is not paid out, the liability of the contractor is limited to the total of the net fee charged to the client within the contract, with a maximum of €5,000, minus the costs paid by the contractor on behalf of third parties.
4. Except in the case of intent or gross negligence on the part of the contractor, the client shall indemnify the contractor for and against, and shall indemnify the contractor in respect of, any claims, claims and actions which a third party may have at any time on the contractor or may institute against the contractor and which directly or indirectly result from or relate to the work or services performed or to be performed by the contractor before the client or otherwise related to the client's assignment to the contractor, including damage, costs and expenses suffered or incurred by the contractor in connection with such claim, claim or legal action.
5. The Supplier shall not be liable for damage, loss or destruction of objects, materials or data made available to him for, by or on behalf of the Client.
Article 14: Suspension, cessation and termination
a. Contractor is entitled to suspend or terminate the further performance of the contract if the client fails to comply with the payment conditions and/or fails to provide the requested bank guarantee or security.
b. If the client fails to comply with any obligation arising for him under an agreement with the contractor, the contractor has the right to suspend the performance of all obligations towards the client and even to consider all agreements with the client wholly or partially dissolved, without requiring a notice of default and/or judicial intervention, while maintaining his right to compensation. The debt owed by the client to the contractor shall be payable immediately.
c. In addition, the contractor is entitled to terminate the agreements existing between him and the client, in so far as they have not yet been implemented, without judicial intervention, if the client does not comply adequately or in good time with the obligations arising for him from any contract concluded with the contractor, or in the event of bankruptcy or suspension of payment of the client or in the event of the termination or liquidation of his company. The consequences of suspension, strike and/or dissolution will be fully borne by the client.
d. Suspension, strike and/or dissolution shall be without prejudice to the payment obligation for the work already carried out. In addition, the contractor is then entitled to claim compensation of damage, costs and interest caused by the failure of the client and the dissolution of the contract, including income lost by the contractor.
Article 15: Delivery period
1. A period of delivery specified by the contractor shall be indicative unless it is stated in writing and expressly that it is a time limit. The contractor is, even at an agreed deadline, only in default after the client has failed him.
2. The commitment of the contractor to an agreed delivery deadline shall cease if the client wishes to change the specifications of the work or fails to comply with his obligation to investigate as referred to in Articles Y and Z.
3. The contraaor is obliged to do all that is reasonably necessary or desirable in order to enable the contraaor to make a timely delivery, in particular by promptly answering the contractor's questions, preventing defective deliveries, the timely delivery of materials to be processed, the timely provision of the information necessary for the performance of the contraa and the timely execution by the contraaor or on his behalf by third parties of work.
4. In the event of non-compliance by the client with the provisions of the previous paragraph, an agreed deadline for delivery is no longer binding and the client is in default without written notice of default by the contractor. The contractor shall then, without prejudice to the rights conferred upon him by law, be entitled to suspend the performance of the contract until the client has recovered this failure. After that, the contractor will still execute the agreement within a reasonable period.
Article 16: Method of delivery and retention of title
1. Unless otherwise agreed, delivery shall be made on the spot where the contractor carries out his business.
2. The contractor is not obliged to deliver the manufactured goods in parts.
3. The client is obliged to cooperate fully in the delivery of the goods to be delivered by the contractor under the contract. The client will also be in default without having been called upon to do so if he does not pick up the goods to be delivered after the contractor's first request or, if delivery has been agreed at his address, refuses to accept the goods to be delivered.
4. Any delivery of goods by the contractor to the client shall be subject to its ownership until the client has fulfilled all that he is required to do under any contract, including interest and costs.
5. The retention of title shall cover at least all services, goods, products, hardware and software provided.
6. The Client is not entitled to dispose of or otherwise lose possession of goods, which is the retention of title mentioned in the previous paragraph of this article.
7. If carriage of the goods to be delivered has been agreed, this shall be done on behalf of the principal, unless a free delivery has been agreed. The client always carries the risk during transport. Transport shall include transmission of data through the telephone network and any similar transmission by any technical means. The acceptance of the contractor's business by the carrier shall be deemed to be proof that they were in a good state, unless the consignment note or receipt shows otherwise.
8. The contractor is not responsible for storing the goods to be delivered, unless expressly agreed upon. If storage is carried out, this shall be done at the account and risk of the sponsor.
Article 17: Duty of care of the Contractor
1. The Agency shall take the utmost care with regard to the client's interests when performing the work for the client.
2. In particular, the contractor shall carry out the tasks provided that clear arrangements have been made in respect of the purpose of the use, ensuring the correct audio and/or visual design of the communications and other materials and for their fulfilment of the relevant legal requirements, rules of conduct, normative values and guidelines, to the extent that they can or should be reasonably known to him.
3. The contractor undertakes to treat and maintain confidentially the data, documents, drawings and designs provided by the client as well as the materials entrusted to him, such as slides, audio/and visual materials, documents and other materials to be reproduced and/or recorded, but the contractor accepts no liability for damage caused by fire, theft or breakup, etc. in so far as the insurance does not cover. In cases where costly or non-replaceable unicas must be used, the client must ensure them on his own account and risk.
Article 18: Inspection upon delivery, claims, concepts and complaints
1. The contraaor is obliged to examine, with an expeditious speed after delivery, delivery or submission, whether the contraaor has properly complied with the contract or shows visible defects, and is also obliged to inform the contraaor immediately in writing, as soon as it turns out otherwise. The sponsor shall make the intended investigation and the relevant notification within 8 days of delivery at the latest.
2. The contractor is always entitled to make a new sound performance instead of a previous defective performance, unless the failure is not recoverable.
3. Compliance with the agreement shall be deemed to be valid between the parties if the client has failed to make the investigation or notification referred to in paragraph 1 of this Article in good time.
4. If the 7-day time limit referred to in paragraph 1 of this Article is to be considered as unacceptable short by standards of reasonableness and fairness for a careful and alert client, this period shall be extended until at the latest the first time the investigation or notification of the contractor to the client is reasonably possible.
5. In any event, the performance of the contractor shall be deemed to be valid between the parties if the client has put the delivered or part of the delivered into service, processed or processed, delivered or put into service to third parties, had it worked or processed or had it delivered to third parties, unless the client has complied with the provisions of paragraph 1 of this Article.
6. After the above deadlines, complaints are no longer dealt with and the client has processed his rights in this respect.
7. Advertising of invoices must be submitted to the contractor in writing within 8 days of the day of dispatch of the invoices. The payment period shall not be suspended as a result of such advertising.
8. Unless otherwise indicated, the information contained in the contract staff records shall be decisive.
Article 19: Client inspection duty for concepts, prototypes and proofs
1. The contraaing authority is obliged to carefully examine the concepts, prototypes, printing, printing or other tests, received or not at its request by the contraaing authority, and to return them to the contraaing authority as quickly as possible.
2. Approval of the tests by the contraaing authority shall be deemed to have been carried out correctly by the contractor.
3. The contractor shall not be liable for defects, errors and defects which have not been detected in tests approved or corrected by the contractor.
4. Any test prepared at the request of the sponsor shall be charged in addition to the agreed price, unless it has been expressly agreed that the costs of these tests are included in the price.
Article 20: Force majeure
1. Deficiencies of the contractor in the performance of the contract cannot be attributed to him if they are not due to his fault, or under the law, the contract or in traffic.
2. Deficiencies of the contractor in the fulfilment of the contract due to war, blockade, riot, epidemic, devaluation, mobilisation, unrest, flooding, closed shipping, other obstructions in transport, stagnation or cessation of supply by public utilities, lack of gas, petroleum products or other means of energy generation, fire, machinery breach and other business disturbances, accidents, strikes, exclusions, trade unions' actions, export restrictions, as well as sudden increase in import duties and excise duties and/or taxes and other government measures, failure to obtain necessary permits and other government measures, failure to supply necessary materials and semi-finished products by third parties, intent or gross debt of auxiliary persons and other similar circumstances, shall be deemed not to be attributable to the contractor and shall not entitle the contractor to terminate the contract or to compensation.
Article 21: Copyright
1. The client guarantees the contractor that by fulfilling the contract and in particular by multiplying or making public the items received from the client, such as copy, filing, designs, drawings, photographs, lithographs, films, data carriers, computer software, data files etc., no rights that third parties may assert under the Copyright Act 1912 or other national, supranational or international rules in the field of copyright or industrial property law or the law relating to the tort. The client shall indemnify the contractor both in and out of law for all claims that third parties may make under laws or regulations.
2. If, as regards the accuracy of the claims made by third parties as referred to in paragraph 1 of this Article, doubts arise or persist, the contractor shall be empowered but not obliged to suspend the performance of the contract until it is established, in law, that the contractor does not infringe those rights by fulfilling the contract. After that, the contractor will still execute the order within a reasonable period.
3. Unless expressly agreed otherwise in writing, the contractor shall always remain the copyright holder who may arise from the works which he has produced during the performance of the contract, such as copy, filing, design drawings, designs, work and detail drawings, information carriers, computer software, data files, photographic recordings, lithographs, films and similar production and aids, even if the relevant works are listed as separate items in the offer or invoice.
4. The goods to be supplied by the contractor according to his design, such as copy, composition, design drawings, models, work and detail drawings, information carriers, computer software, data files, photographic recordings, lithographs, films and similar production and aids, as well as any part of the essential design thereof, even if or to the extent to which the design is not subject to copyright or other legal protection for the contractor, may not be reproduced without his written consent in the context of any production process.
5. After delivery by the contractor, the client acquires the non-exclusive right to use the works produced by the contractor under the contract within the meaning of the Copyright Act 1912 or works within the meaning of paragraph 4 of this Article. The same right of use shall be limited to the right of normal use of the goods delivered and shall not, in particular, include the use to reproduce these goods in the context of any production process.
Article 22: Intellectual property
1. In accordance with the provisions of the Copyright Act 1912, all goods manufactured by the contractor, in whatever form, will remain the spiritual property of the contractor on behalf of the client.
2. The client and contractor are free to use the workpiece or a single duplicate for their own publicity or promotion as well as for the exhibition of this workpiece, where they have the right to mention each other's names. However, this is not until the work or the first reproduction of it has been made public (including pre-publications and zero numbers) and not beyond the limits of use, circulation and distribution laid down by the agreement.
3. Contractor shall not be liable if the design or subsequent reproduction, or licence or use of the design, infringes any copyright, exclusive right to design or design, trade mark, patent right of a third party unknown before or at the time of delivery of the design, including the working drawings.
4. Texts and images provided by the client must be checked by the client for authenticity and must not be contrary to any third party's right. The client is fully liable for this.
5. The client is not entitled to any further or other use of the commissioned or expressly agreed use. If nothing has been agreed in this respect, the first use shall be deemed agreed.
6. The client is not entitled to modify the contract produced without the explicit consent of the contractor.
7. The contractor is at all times entitled to sign the contract produced in a reasonable manner. This signing is then part of the work and should therefore not be removed by the client.
Article 23: Materials, retention, archiving and release
1. All designs, texts, descriptions, reports, opinions, artistic performances, lithographs, slides, films and other publicity materials (other than: "non-woven materials'), which the contractor develops or develops for or in connection with a contract, shall be surrounded and preserved by contractors with the greatest possible care for two full calendar years.
2. The contractor keeps an archive of her digital files and productions. This is merely a unilateral commitment of effort from which no rights can be derived. Digital productions are backed up if possible. These digital files are stored for 2 years. This means that a client, if he wishes to reproduce or otherwise use these archive files, may request the contractor to use the above archived files. However, it is for the contractor's discretion whether these files still have the required quality for the desired application. The contractor cannot therefore be held liable for the fact that archived items are no longer usable for the intended purpose.
3. At the end of the above period, the contractor may request the client to inform whether it would like the materials to be kept by the contractor for a longer period.
4. The contractor shall issue the materials at the request of the client, provided that the relevant invoices are paid.
5. At the end of the cooperation, the contractor will issue the materials still under her ownership to the client at first request, without retaining a copy, copy, summary or any other part, provided that the client has paid all the invoices which he has denied, at least provided reasonable assurances.
Article 24: Confidentiality
1. The contractor shall ensure the confidentiality of all business information which is known to the client to be treated as confidential by the client under the contract.
2. In particular, the contractor shall assume that clear arrangements have been made with regard to the purpose of use, ensuring the correct design and materials and ensuring that they comply with the relevant legal provisions, rules of conduct and guidelines, to the extent that they may or should be known to him, taking into account the relevant provisions of intellectual property. (Article 20 (3)).
3. Company details of the client shall be made available by the contractor to its employees, suppliers or media only if and to the extent necessary for the performance of the contracts. The Supplier shall never disclose this information to third parties for inspection or use, or use, for the benefit of third parties, during the duration of this Agreement and after its conclusion without the consent of the Client.
Article 25: Nature and duration of the agreement
1. Unless expressly agreed otherwise in writing or as a result of the nature of the contract, the cooperation shall be open-ended, on the understanding that both parties may terminate the relationship against the first of a calendar month by registered letter, subject to a minimum period of six months.
Article 26: Settlement of the relationship
a. All designs, reproduction materials, texts, descriptions, artistic performances, films and other publicity materials that are at the end of the relationship as a result of the relationship with the contractor will be transferred by him at first request at cost (any costs for the transferability of digital and other materials) to the client, after all what the client owes to him, from whatever reason, will be met.
b. In all cases where the relationship between the client and the contractor ends, pursuant to any provision of these terms or through the court, these conditions continue to govern the legal relationship between the parties, to the extent necessary for the settlement of the relationship.
Article 27: Competent court
a. The legal relationship between the contractor and the client or other third parties is governed by and is subject to Dutch law.
b. All disputes arising from or related to (I) the activities performed by or on behalf of the contractor and/or (II) the legal relationship with the client or other third parties shall be subject to the exclusive jurisdiction of, and shall be decided exclusively by, the competent court in Amsterdam. These general terms and conditions are deposited with the Chamber of Commerce in Utrecht and are sent on request.